← Back to jobsPosted (ATS) 7/20/2026, 12:00:00 AM Updated (ATS) 7/20/2026, 12:00:00 AM First seen by us 8/12/2026, 5:32:04 AM Last re-seen 10/19/2026, 9:15:56 PM Distinct job IDs 1 Open in parallel 1 Work locations 1 Cumulative days active 92 Stagnancy score 58.31 ATS job ID R68866 Apply to the latest listing (your funeral) →
GhostHigh-confidence zombie posting. HR is probably not actually hiring.
Lunar Operations - Quality Engineer III (Weekend C and D Shifts)
Blueorigin · Space Coast, FL
A posting in this role has sat open 92 days — well past the 90-day mark where an opening reads as a resume black hole rather than an active search.
Rotation timeline
Every ATS job ID we've matched to this same normalized title, oldest first. "Posted" is the date the ATS reports; "last confirmed open" is the last time we saw it live.
- Location
- Space Coast, FL
- Posted (ATS)
- Jul 20, 2026
- Last confirmed open
- Oct 19, 2026
- Open for
- 92 days +
Data provenance
- Source platform
- workday
- Latest listing found
- https://blueorigin.wd5.myworkdayjobs.com/blueorigin/job/Space-Coast-FL/Lunar-Operations---Quality-Engineer-III--Weekend-C-and-D-Shifts-_R68866
- Stream ID
- 68ff5056-573e-4f5c-ba54-4adddc3b8d9e